Procurement Technical Guide
What parameters are needed for a custom EV battery pack?
Direct Answer
Custom EV battery pack development usually requires vehicle type, target voltage, capacity, range, load, installation dimensions, connector direction, communication protocol, operating environment, certification requirements, target market, and expected annual volume.
Key Takeaways
- Capacity alone is not enough for custom pack development.
- Voltage, installation space, BMS, connectors, and certification all affect the proposal.
- Battery swapping projects need interface and data requirements.
- Expected annual volume affects sample and mass production planning.
Required information
| Category | Information to provide |
|---|---|
| Vehicle and use case | Electric two-wheeler, swapping battery, delivery fleet, tricycle, low-speed EV, or other application. |
| Electrical | Voltage, capacity, peak current, charging method, expected range. |
| Mechanical | Length, width, height, mounting, connector direction, protection requirements. |
| BMS and system | Communication protocol, data tracking, swapping cabinet interface, protection strategy. |
| Business | Target market, certification needs, sample schedule, annual volume, and target cost. |
FAQ
What if I do not know the exact capacity?
You can provide vehicle type, load, target range, and usage frequency. The engineering team can estimate a capacity range.
What should overseas buyers send to a custom EV battery pack manufacturer?
Vehicle type, voltage, capacity, dimensions, connector direction, BMS protocol, charging rate, target market, certification needs, sample quantity and annual volume.
Does XGE support OEM lithium battery pack and ODM lithium battery pack projects?
Yes. OEM and ODM projects can be evaluated by voltage, capacity, housing, BMS, label, packaging, documents, MOQ and lead time.
What does an EV battery pack supplier need for quotation?
Vehicle type, voltage, capacity, dimensions, connector, BMS, charging rate, target market, sample quantity, annual volume and document requirements.
What should buyers confirm about lead time?
Buyers should separate sample lead time, pilot batch lead time and mass-production lead time because custom housing, BMS and validation can affect each stage.
Sources and Content Review
Sources
- Shanghai Xinhui Green Energy product brochure and technical materials
- XD18169X23T CCC certificate
- National compulsory product certification test report cover
- GB 43854-2024 related certification requirements
- Final project specifications are subject to the mutually confirmed specification
Content Review
- Product team
- Certification document team
- Last updated: 2026-05-24
Ready to request a custom pack?
Submit vehicle and project requirements for an initial recommendation.
Submit Inquiry